Located in the Var department, within the municipality of Figanières (83830), the photovoltaic power plant enjoys a strategic position near an existing solar park. Spread across 20.2 hectares, the facility will generate approximately 14 GWh of renewable electricity per year — enough to cover the annual consumption of around 6,500 residents.
This production alone will account for nearly 9% of the yearly energy needs of the Draguignan Urban Community.
Key facts
Location: Figanières, Var, France
Area: 20.2 hectares
Capacity: 15.6 MWp (27.459 modules)
CO₂ savings: - tons per year
Equivalent consumption: 6,500 people annually
Project Objectives
Enhance local energy security
Support the territory's energy self-sufficiency
This project exemplifies a harmonious balance between sustainable development, preservation of natural areas, and tangible benefits for the local community.