Aperam - Genk, BE
![//perpetumenergy.com/wp-content/uploads/2022/03/PER-newsite-v3_27.jpg](http://perpetumenergy.com/wp-content/uploads/2022/03/PER-newsite-v3_27.jpg)
![//perpetumenergy.com/wp-content/uploads/2022/04/renewable-energy-icon.png](http://perpetumenergy.com/wp-content/uploads/2022/04/renewable-energy-icon.png)
size
23 MWp
- OUR SCOPE:
- DEVELOPMENT
- INVEST
- EPC
- O&M
![//perpetumenergy.com/wp-content/uploads/2022/07/aperam-mix2.jpg](http://perpetumenergy.com/wp-content/uploads/2022/07/aperam-mix2.jpg)
Green energy at Aperam, Genk
This installation in Genk commissioned by Aperam, was not only - as every project is - challenging regarding budget and planning; it was also challenging in terms of its complexity and technical aspects. Several large factory roofs with solar panels, ground-mounted panels, a large carport with over 80 EV charging points and an energystorage project resulting in a 23 MWp operational site.