Powerfield - Ter Apelkanaal, NL
![//perpetumenergy.com/wp-content/uploads/2022/07/PowerfieldTerApelkanaal-01-1.jpg](http://perpetumenergy.com/wp-content/uploads/2022/07/PowerfieldTerApelkanaal-01-1.jpg)
![//perpetumenergy.com/wp-content/uploads/2022/04/renewable-energy-icon.png](http://perpetumenergy.com/wp-content/uploads/2022/04/renewable-energy-icon.png)
size
15.3 MWp
- OUR SCOPE:
- EPC
- O&M
![//perpetumenergy.com/wp-content/uploads/2022/07/Powerfield-mix-1.jpg](http://perpetumenergy.com/wp-content/uploads/2022/07/Powerfield-mix-1.jpg)
A 10 ha ground-mounted project, good for 15.3 MWp
This installation is the largest ground-mounted project built by Perpetum Energy in the Netherlands so far. On 10 ha of land, next to the site of a potato factory, al 15.3 MWp project was installed and completed in 2021.