The official inauguration of the Hélios solar park in Jemeppe-sur-Sambre took place on 26/09/2024. The facility was commissioned on 04/09/2024, a symbolic date as it marks the start of construction exactly one year earlier.

The sun may not have blessed us with its presence, but we were fortunate to have Sophie Wilmès, Vice-President of the European Parliament, Cécile Neven, Walloon Minister for Energy and the Air-Climate Plan, Denis Mathen, Governor of the Province of Namur, and the CEOs of INEOS INOVYN and Perpetum Energy, Geir Tuft and Luc Leenknegt.

 

The Hélios solar park project will provide 60MW of renewable electricity and reduce emissions by 14,000 tonnes of CO2 annually.

Press news:

PerPetum Energy is constructing a customized solar carport with white round columns & full black solar panels where esthetics and technical engineering go hand in hand.

  • Power: 1114 kWp
  • 24 charging points are installed

We execute our construction site in 2 phases so that disruptions on our parking lot are kept to a minimum.

Next to the parking, we are building a ground-mounted solar installation in an adjacent meadow of AZ ZENO. A sufficient height has been taken into account for the green keeping by sheep.

(1) Interview of Jo Dendauw, Facility Director AZ Zeno

 

On february 2024, 24.000 of the 90.000 pannels already installed. This facility will be the largest in Wallonia!  Work is progressing rapidly, and the commissioning is expected in July 2024.

The INOVYN – JEMEPPE-SUR-SAMBRE project will provide 60MW of renewable electricity and reduce emissions by 14,000 tonnes of CO2 annually.

Luc Leenknegt, CEO and founder of PerPetum Energy said, ‘We are proud to contribute to INEOS Inovyn’s environmental objectives. This project is totally in line with PerPetum Energy’s mission: to help industrial companies and large consumers to reduce the carbon footprint of their consumption as much as possible, by offering them an optimised mix of multi-technology solutions such as photovoltaics, wind power and energy storage.’

They talk about us:

 

On December 12, 2023, the commissioning of the photovoltaic installation in Marche-Les-Dames, owned by the Lhoist group, took place. Comprising 6,831 panels and covering an area of about 4.4 hectares, this park will produce 4.7 MWh per year (equivalent to the consumption of 2,300 Walloon households). About 80% of the energy produced by the park will be directly consumed by the Marche-Les-Dames factory, helping to avoid the emission of 2,100 tonnes of CO2 per year.

The photovoltaic carport at Pairi Daiza received the Public’s Choice Award for Sustainable Infrastructure 2023 at the Green Solutions Awards ceremony, held on September 19 at the Tour&Taxis site in Brussels.

The Green Solutions Awards are prizes awarded by Construction21, the network for information and networking among players in sustainable construction.

This is both an encouragement and a source of pride for the teams at Prefabois, Perpetum Energy, and Green4Power, who have been working for years with Pairi Daiza’s Energy & Sustainable Development department on this solar installation, the extension of which will soon be commissioned.

As the winner of this Green Solutions Award received on September 19, the Pairi Daiza solar carport will automatically participate in the International Grand Prix for Sustainable Infrastructure, held during the COP28 climate conference in Dubai from November 30 to December 12, 2023.

Perpetum Energy, Prefabois, Green4Power, and Pairi Daiza also hope to impress the international community with what is currently the largest solar carport in the world.

       

Perpetum Energy, in partnership with Q-Energy, Solutions30 Group, and Ciel&Terre International, is proud to contribute to the construction of the largest floating installation in Europe. This installation will be built on the site of former gravel pits owned by the Etablissements Blandin, located in France, in the Haute-Marne department, and will be spread across 6 islands.

  • Number of panels: 135,000
  • Surface area: 127 ha
  • Power: 74.3 MWp

This floating park will provide electricity to the equivalent of 37,000 residents and will help avoid the emission of approximately 18,000 tonnes of CO2 into the atmosphere each year.

All details can be found in specialized, regional, and environmental press.

Article Capital.fr: Q Energy va construire le plus grand parc solaire flottant d’Europe avec Solutions30 – Capital.fr

PV Magazine FR: Q Energy débute la construction en Haute-Marne du plus grand parc solaire flottant d’Europe – pv magazine France (pv-magazine.fr)

Suivez-nous sur notre page Linkedin: Publier | Fil d’actualité | LinkedIn

Perpetum Energy will build this great project, and Green4Power, our investment vehicle will finance it!

INEOS Inovyn is Europe’s leading producer of vinyls and in the top three worldwide. With an annual turnover of €4.5 billion, INEOS Inovyn has circa 4.200 employees and manufacturing, sales and marketing operations in 8 countries across Europe.

  • The facility is the size of 56 football pitches and will supply 10% of INEOS Inovyn’s electricity demand at the site from 2024.
  • This project will be one of the biggest solar farms in Belgium and ‘the’ biggest ever to be built in the Wallonia region.
  • The investment is part of INEOS Inovyn’s wider plans towards net zero 2050 and will save 14.000 tonnes of CO2 per year, the equivalent of the annual consumption of 16.000 households in Belgium.

Ce 30.03.2023 a eu lieu l’inauguration officielle de notre dernier projet qui a vu le jour sur les terres de la Commune de Braine l’Alleud. Cette inauguration a eu lieu en présence de Mr Vincent Scourneau, Bourgmestre de la commune de Braine l’Alleud, de Mr Jan Putmans, le propriétaire du site, ainsi que des représentants de UCB.

Cette installation au sol, placée sur le site de Sodever, s’étend sur une surface de 19ha avec une puissance de 12.000 kWc.

A ce jour, cette installation photovoltaïque est la plus grande réalisée en Wallonie, avec un nombre total de modules équivalents à 18.432 unités, qui produiront 12 GWh par an.

 

  • Le vendredi 21 Octobre a eu lieu la pose du premier panneau photovoltaïque sur le site de Sodever, à Braine-l’Alleud, en région Wallonne. Cet évènement a eu lieu en présence de Madame la Ministre Valérie De Bue, Monsieur le Secrétaire d’Etat Mathieu Michel, du Bourgmestre Vincent Scourneau, ainsi que des autorités communales, du propriétaire du site Monsieur Jan Putmans, des représentants d’UCB. Perpetum Energy ayant été représenté par notre Directeur Commercial Jérôme Flament.
    Ce parc photovoltaïque s’étendra sur une surface de 19 Ha.
    Une fois terminée, cette installation sur le site de Sodever représentera:
    Une puissance de 12.000 kWc
    Une production annuelle de 13 GWh
    Un nombre total de module équivalents de 18.432 unités

Ils en ont parlé: Canal Z – L’Avenir – Sud Info / La Capitale – La DH

voir la vidéo de tvcom